Flow reports
Detailed charts and reports on production capacity and statistics for the resources used.

Tecnomatix is the Siemens portfolio of digital manufacturing solutions that helps you digitalize production and turn innovative ideas into products.
It brings product engineering, manufacturing engineering, production and service operations into one shared environment. Processes, lines and robotic cells are designed, simulated and validated virtually before they are built. The portfolio includes Process Simulate and Plant Simulation.

Simulate logistics and the flow of materials and people to improve system performance.
Available courses: Plant Simulation Basics (5 days), Set up Plant Simulation 3D objects (1 day), advanced modeling techniques (3 days).

Design, simulate and program offline using robots, automated cells and automation.
Plant Simulation is software used to simulate material and personnel flows in complex production and logistics systems. You can create 3D or 2D models, digital replicas of physical systems. This quickly reveals system characteristics such as production capacity, daily output, efficiency, energy consumption and costs.

The service covers “what if” scenarios: adding an extra operator per shift, the effect of an additional buffer, or raising productivity by replacing a human operator with a robot.
The virtual model reproduces the physical system and lets you run any number of tests and scenarios without stopping the production line. A whole year of factory output can be simulated in minutes, with no long and costly tests on the real system.
Detailed charts and reports on production capacity and statistics for the resources used.
Test changes in the virtual model before applying them in the factory.
Estimate, for example, the production increase after a change without stopping production.
It is building a virtual model of a production or logistics system in Tecnomatix Plant Simulation, on which you can run “what-if” scenarios without stopping the real line.
A full year of production can be simulated in minutes, with no long and costly tests on the real system.